Schwab-Eaton worked with the City of Hesston to design new water storage improvements for the community. The project consisted of demolition of the existing 300,000-gallon elevated water storage tank and construction of a new 500,000-gallon composite-style elevated water storage tank. The City logo was painted on each side of the new tank. These improvements were made possible with financing from a KDHE State Revolving Loan Fund.
Project Description
Project Details
City of Hesston
Hesston, KS
500,000-gallon water tower
Topographic Survey
Construction Documents
Construction Inspection and Observation
Paint Inspection
